Not Coming Up Today

Hi Rambabu,

I am still in the process of fabricating the cavity, which now needs to have the probe mounted and all the seams soldered.


The other things on my todo list are:

  • Purchase 2m of LMR-400 cable
  • Make the launcher for the magnetron probe, which I will do out of copper too.
  • Get proper barbed nozzles for the circulator water cooling.

I will then also need to drain the oil from the magnetron cooling system in order to use it to pump the water through circulator.  We can use a fan on the magnetron for now.